chevron_left

Case Study

Children with Cancer Event

Event: Children with Cancer UK

Client: Children with Cancer UK

chevron_right Read More

The Challenge: 

C3 had to build within a restrictive limited timeframe. We were able to source local crew and implement some of the tech the church already had with our systems. We used and integrated across platform technology, with the technicians able to arrange this onsite as we could not access the site prior to the event. Other challenges that were posed were a  reverberant hall and a complex load in because of age and accessibility of street.

The Solution

We created a system of cross compatibility with their technical teams, equipment and ours. The event catered for several hundred people and we were able to deliver without fault or delays to the schedule and budget. Our team worked closely with the different choirs leads to sound check large performance groups for the event within a limited timeframe. 

Services Provided:

  • Technical Production
  • Video Distribution
  • Sound Distribution for Choirs 
  • Liaising with local and in-house crew